What We Build Where We Build
Pacific PalisadesMalibuBrentwoodBel AirBeverly HillsHollywood HillsTopangaSherman OaksStudio CityEncinoCalabasasWestlake VillageAltadenaPasadena
How We Build
The ProcessStructural Systems
About Contact Us

Home/Malibu/Fire rebuild contractor

Rebuilding in Malibu after fire, with a builder who has done it here before.

Burned lots on the bluff and up the canyons, like-for-like rebuilds and new designs on old ground. Addition Building & Design is a family-run design-build firm with over 40 years as a builder in Los Angeles, a Malibu fire rebuild finished, and four more under way in the Palisades.

A contemporary Malibu home at dusk, rebuilt after fire
Photograph · a Malibu home rebuilt after fire

After the fire

The lot is yours. The lot has changed.

Rebuilding your home from the Woolsey Fire in 2018 or the January 2025 wildfires is more than a construction project: it's a new beginning. At Addition Building & Design, you work directly with the people leading your project. Mike Ross, our founder and CEO, holds the license and personally oversees the building process, collaborating with our architectural and design partners, coordinating structural engineering, managing permits, and maintaining hands-on involvement throughout construction. Christine Ross leads the business operations, including the builder documentation needed to support your insurance claim and keep the process moving forward.

From the first conversation to the final walkthrough, you have direct access to both of us. With decades of custom home-building experience, we bring personal accountability, clear communication, and the attention to detail your home deserves.

Three ways a Malibu lot comes to us

The path depends on where you are. The standard does not.

No. 01

A burned lot, no plans yet

You own the ground and the insurance file. We help you see the full financial picture first: we review your insurance for any unclaimed benefits, help you understand your SBA disaster loan options and potential additional funding, identify the gap between the funds available and your rebuild budget, and make the plan to bridge it. Then we survey the lot, order the soils and septic work, and design a home that fits the rebuild path where it can. One team from the first sketch to the keys.

No. 02

Like-for-like, or close to it

You want what you had, brought up to the code and to how you live now. Rebuilds that substantially match the original home move through review faster than a new design. We keep you inside that envelope wherever the design allows and say plainly when a wish steps out of it.

No. 03

Restore it, or start new

Rebuilding in Malibu doesn't mean recreating the home you lost. You can rebuild like-for-like, with the City's allowance for added size, or design an entirely new custom home that meets today's zoning. What you can build depends on your lot's zoning, the coastal zone and the site itself. We're here for both paths, whether you're restoring what you loved or creating something entirely new.

Permits, code and the claim

Three things a Malibu rebuild has to get right early.

No. 01

The right office

Inside the city limits your rebuild runs through the City of Malibu, with the coastal zone reviewed alongside it. Lots in the unincorporated canyons run through the County of Los Angeles. The two paths differ in forms, fees and timing, and we confirm which one holds your lot before a line is drawn.

No. 02

The wildfire code

Every rebuild we build in Malibu is detailed to California's wildland-urban interface standard: ignition-resistant assemblies, ember-resistant vents, tempered glazing, decks built for embers. It is the same standard on the fast path and the standard path, and it is the reason the next house stands.

No. 03

The insurance scope

Your settlement was written against the house you lost, not the one the code now requires. We separate the code-required upgrades in the scope so your ordinance-and-law coverage can be claimed, and give your adjuster a line-item document rather than a lump sum.

Where in Malibu

Which part of Malibu is your lot in?

Malibu is a long, thin city of coast and canyon, and its two fires reached opposite ends of it. Where your lot sits decides which fire's rules apply, which office you file with, how a truck reaches the site and what the ground under the house has been through. We build in all of it.

East of the pier

The January 2025 fire

The Palisades fire came along the coast into eastern Malibu: Big Rock and Big Rock Mesa, Las Flores Canyon, La Costa, Carbon Canyon and Carbon Beach, Rambla Pacifico, Rambla Vista and Las Tunas Beach. Steep lots above the highway, septic on most of them, and a rebuild path at City Hall that is open now. Our two Malibu rebuilds under way are in this end of the city.

West of the Civic Center

Woolsey country

Westward the city runs out along the canyons, points and beaches the Woolsey fire crossed on its way to the sea in November 2018: Corral Canyon, Latigo Canyon and Latigo Shore, Escondido Beach, Malibu Cove Colony, Winding Way, Ramirez Canyon, Paradise Cove, Point Dume, Zuma Canyon, Malibu Park, Sycamore Park, Malibu West, Trancas Canyon and Trancas Highlands, Broad Beach, Sea Level Drive, Encinal Bluffs and Encinal Canyon. Many of those rebuilds are finished. Some are still waiting on a decision, and the City's Woolsey programs close at the end of this year.

The center of town

Around the Civic Center and the pier

Malibu Colony, Malibu Road, Serra Retreat, Malibu Country Estates and Malibu Knolls. Here the work is more often a remodel or a new home than a rebuild, but it runs through the same City review, the same coastal zone and the same wildfire code, and usually the same septic question.

Not every house in these neighborhoods burned, and no two lots in them are alike. Tell us the street and we will tell you which office holds your lot and which three site reports to order first.

A Pacific Palisades fire rebuild on Paseo Miramar, nearly finished

Rebuilding now

Two Malibu rebuilds under way, five more in the Palisades.

From Paseo Portola to Pacific Coast Highway in Malibu, our rebuilding projects share a common story: the January 2025 wildfires, the challenges of rebuilding under today's wildfire-resistant building standards, and the same family-owned team guiding homeowners through every step.

To respect our clients' privacy, we share street names only. Specific addresses are available with homeowner permission.

Every property has its own challenges. Every rebuild deserves personal attention.

Contact us to walk through one of our projects and see firsthand how Addition Building & Design approaches the rebuilding process.

  • Paseo Portola, MalibuUnder way
  • Pacific Coast Highway, MalibuUnder way
  • Pacific Palisades, five homesUnder construction
  • Altadena and Brentwood, three homesUnder way
Mike and Christine Ross seated on lumber at a wrapped rebuild site

A family firm

The people whose name is on the firm are on your site.

Four to five projects a year is the only way a family can stay personally involved in every build. A builder with over 40 years in Los Angeles, a daughter carrying the firm forward, and one phone number: 310.617.2722. Our Pacific Palisades office is at 15278 Antioch St, minutes from the Malibu city line.

Our custom homes in Malibu

Questions Malibu families ask us

Before you sign anything.

Yes. A contemporary Malibu home rebuilt after fire is in our portfolio, detailed to the wildfire code and finished as a family home. Four more fire rebuilds are under way with us in Pacific Palisades today.

Inside the city limits, by the City of Malibu, with the coastal zone reviewed alongside. Lots in the unincorporated canyons run through the County of Los Angeles. We confirm which office holds your lot before we design, because the two paths differ.

No, but rebuilding substantially what stood before, with a modest allowance for added size, is the faster path through review. We keep you inside that envelope where the design allows, and tell you the cost in time when a wish steps outside it.

That is one of the first things we have inspected. Fire and cleanup can damage an onsite wastewater system, and its condition and capacity can set the size of the rebuilt house. We have it assessed before the design starts.

Yes. We write a line-item scope your adjuster can work from, separate the code-required upgrades so ordinance-and-law coverage can be claimed, and stay involved through the claim.

All of them, inside the city and up the canyons: the eastern neighborhoods the January 2025 fire reached, from Big Rock and Las Flores Canyon to Carbon Beach and Las Tunas Beach; the western ones the Woolsey fire crossed in 2018, from Corral Canyon and Point Dume to Malibu Park, Trancas and Encinal; and the center of town around the Civic Center. Our two Malibu rebuilds under way are in the eastern end.

For many lots, yes, but the City of Malibu's Woolsey programs end this year. Owners approved to rebuild a home that no longer meets today's zoning (the City calls that a planning verification) have until November 8, 2026 to pull the building permit or file for more time, and the City waives no fees after December 30, 2026. Those dates are from the City's rebuild page, checked 31 October 2026. If you lost a home in 2018 and have not pulled a permit, call the City's rebuild desk this week, then call us.

Elsewhere on the coast and in the hills

Next door

Rebuilding in the Palisades

The City's rebuild path, four homes under way.

Up the canyon

Rebuilding in Topanga

County permits, canyon ground, the same wildfire code.

How we build

Fire-resistant construction

The four systems we build with, and the code underneath them.

Contact Us

Begin with a conversation.

We take on a select number of significant projects each year. If you are considering a custom estate, a hillside build, or a full transformation, we would be glad to walk the property with you.